Kashagan Power Plant

This power-plant is part of the huge complex of Oil&Gas field Kashagan in Kazakhstan, Atyrau area, north of the Caspien sea.

It has been awarded to Bateman Kazakhstan on a Turn-Key contract of $189 Million by Agip KCO, in 2004. The first stage included 4X45 MW gas-turbines Frame 6 by GE. Second stage another 2X35 MW steam turbines were added. The project also included 3 diesel essential generators, Step-up transformers to 35KV and a switchyard.

Main construction contractor –  GATE İnşaat Taahhüt  The Operator – NCOC.

Services

Services

The Owner Engineer act on behalf of the Owner vis-à-vis the Project Manager of the Main Contractor, mainly on the technical aspects of the project, and serves as “Eyes and Ears” on the ground. He oversees the work of the Main Contractor from aspects such as: Quality of design and construction, compliance with contract’s specifications, Safety and regulation.
The Owner Representative vis-à-vis the Project Manager of the Main Contractor. The Owner Project Manager oversees the contract with the main contractor on all levels: Technical, financial and legal.
He reports back either to the CEO of the Special Purpose Company or to the Board of Directors.
The Lenders’ Technical Advisor’s duty of care is to the Lenders financing the Project, to ensure that funding is delivered on time, keeping the project progressing, while assessing cost, risks and schedule.
Providing assessments and reports on technological projects in areas such as: Power, Energy, Desalination, Green Energy, Energy Storage and transportation. The assessments cover aspects such as preliminary feasibility study, technical overview, and economic model robustness.